Waste carried by river currents does not always accumulate in one place. Some gets caught along the riverbank, some continues moving with the current, and some only begins to pile up after heavy rainfall. These conditions make it necessary to establish clear collection points for river cleanup activities.
One of the solutions used is a trash boom, a floating barrier designed to retain or direct waste floating on the water surface. This system is also known as a floating trash barrier. The trapped waste is then removed to prevent it from being carried farther downstream.
However, determining where to install a trash boom involves more than simply measuring the width of a river. Workers also need to understand where the waste will move, which side of the river it will collect on, and how it will be removed from the water. These three factors are closely related to daily cleanup operations.
Understand How Waste Moves Before Choosing a Location
Every river has different conditions. In one location, the current may remain relatively calm throughout the day. In another, the direction and speed of the water may change after rainfall, when water gates are opened, or due to tidal influences.
For this reason, a field assessment should be carried out before determining the trash boom location. Observe where the waste comes from, which parts of the river it most frequently passes through, and where it tends to become trapped naturally.
For example, waste flowing from a tributary may appear in greater quantities near the point where two waterways meet. However, installing a barrier directly at a river junction may not always be suitable. Swirling currents or changes in flow direction can make waste collection and removal more difficult.
Observations should be conducted under more than one water condition. A location that appears safe during the dry season may experience much stronger currents during the rainy season.
Choose a Trash Boom Location That Is Easy to Access
The best location is not always the narrowest section of a river. A shorter span may simplify planning the length of the barrier, but working access and water flow conditions must still be considered.
Several conditions should be checked:
The direction of water flow is reasonably predictable. Waste can move toward the designated collection area.
The riverbank allows cleanup activities. There is sufficient space for workers to operate and remove waste safely.
Changes in water level can be anticipated. The position of the barrier and its anchoring system must suit local water conditions.
Suitable anchoring points can be planned. The anchoring system should not rely on trees, fences, or structures without first assessing their suitability.
The installation does not interfere with the river's function. The location must take drainage, water infrastructure, boat traffic, and the requirements of the river management authority into account.
A location frequently crossed by floating waste but difficult for collection vehicles to reach may create additional work. The waste may be successfully trapped, but workers might need to move it several times before it reaches the designated storage area.

Decide Which Side of the River Will Collect the Waste
Once a potential location has been identified, the next step is determining the direction of waste collection. This often determines whether the cleanup process will be practical or difficult for workers.
In some locations, a trash boom is installed diagonally across the direction of water flow so that trapped waste can move along the barrier toward one side of the river. This arrangement may be considered when the selected riverbank provides adequate access for waste removal.
Other barrier designs create a collection area in the middle of the river. Such arrangements require a different removal method, such as access using a workboat or facilities specifically designed to reach the accumulation point.
There is no single installation arrangement suitable for every river. The barrier angle, span length, depth of any curtain or net used, and anchoring strength must be adjusted according to the current and the types of waste found at the location. The barrier must also be designed to prevent accumulation from creating dangerous flow restrictions when water discharge increases.

Provide Access for Removing Waste from the Water
Trapped waste must be removed regularly. For this reason, the removal route should be discussed during the site survey rather than after the trash boom has been installed.
First, check whether workers can approach the accumulation point from the riverbank. If waste is collected manually, the working surface must provide safe footing and should not be slippery. If lifting equipment is required, determine whether it can enter, operate, and leave the location without damaging surrounding facilities.
Second, designate a temporary waste storage area on land. Wet waste generally requires suitable containers to prevent leachate and residual materials from spilling back into the river. From this area, the waste can be sorted and transferred to collection vehicles according to local waste management procedures.
Third, make sure there is a route for transporting waste out of the site. Narrow roads, steep stairs, or unstable riverbanks can become obstacles even when the collection point itself appears ideal.
An example of this approach was seen in the activities of Perum Jasa Tirta I on the Surabaya River. According to a 2020 report, waste intercepted using a trash boom was subsequently lifted with the assistance of heavy equipment and transferred to a collection area. This example demonstrates that waste collection facilities need to be supported by a clear removal method.
The Role of Floating Cubes and Modular Pontoons in Cleanup Operations
Not every waste collection point can be reached directly from land. Under certain conditions, floating facilities may be needed to allow workers to approach the work area. One option that can be considered is an arrangement of floating cubes forming a modular pontoon.
Floating cubes are buoyant modules that can be connected according to the required area. As part of a facility for working on water, they can be arranged to create access routes or platforms where site conditions permit.
Karya Pilar Nusantara provides Karpinus Floating Cubes made from HDPE, with individual module dimensions of 50 × 50 × 40 cm. Using these modules to support cleanup activities requires consideration of working loads, stability, connections, anchoring, and river conditions.
It is important to distinguish between a barrier that traps waste and a pontoon that provides access for workers. Floating cubes do not automatically replace the function of nets or other waste retention components in a trash boom system. They serve different purposes, although in certain projects they may be designed as parts of the same facility.

Set a Cleaning and Barrier Inspection Schedule
An installed trash boom still requires monitoring. Waste left to accumulate can increase the load on the system, partially obstruct water flow, or be carried away again when the current changes.
The cleaning schedule does not have to be the same at every location. Rivers that carry large amounts of waste require more frequent inspections than relatively clean waterways. After heavy rainfall or rising water levels, the condition of the barrier and the collection point should be evaluated as soon as it is safe for workers to do so.
During routine inspections, pay attention to the amount of trapped waste, the condition of connections, ropes or other anchoring components, barrier positioning, and the presence of large objects such as logs. If displacement or damage is found, waste removal activities must follow the applicable safety procedures.
Simple recordkeeping is also useful. Cleaning dates, the quantity or weight of waste removed, and water flow conditions can provide information for evaluating whether the trash boom location is appropriate or requires adjustment.
Information to Prepare Before Procuring a Trash Boom
Before determining material requirements, several pieces of information should be prepared by the river manager or project contractor:
River width and estimated depth at the proposed installation point.
Photographs and videos of water flow conditions, including the direction in which waste moves.
Changes in water level under normal conditions and when discharge increases.
The planned waste collection and removal point along the riverbank.
The dominant types of waste, such as plastic bottles, bags, branches, or large materials.
Access for workers and vehicles, including plans for temporary waste storage.
Information about the river management authority and installation requirements for the relevant river section.
This information provides a basis for discussing the barrier arrangement, floating components, waste retention system, anchoring, and supporting facilities.
The number of modules or total barrier length should not be determined solely by river dimensions, because current conditions and cleanup methods may affect the overall design.
A Trash Boom Helps Collect Waste, but Cleanup Determines the Results
A trash boom can help direct floating waste toward a location where it is easier to manage. However, its effectiveness depends on selecting the right installation point, understanding water flow conditions, providing adequate anchoring strength, and ensuring workers are prepared to remove the accumulated waste.
It is important to remember that floating barriers are generally intended for floating waste. Sunken waste, sediment, and dissolved pollutants require other treatment methods. Efforts to reduce waste disposal at its source also remain necessary.
For river managers, contractors, and institutions planning waste collection facilities, conducting an early site assessment can help determine an arrangement that better suits actual field conditions.
For floating cubes and modular pontoon facilities supporting water-based projects, product information and consultation services are available through the Karya Pilar Nusantara team. Provide the area dimensions, water flow conditions, and intended use so that module and accessory requirements can be discussed further.



